Sunday, October 18, 2026

Sponsors

Route 1 Milling and Resurfacing Set

Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:30 p.m. to 5 a.m. (Sunday night through Friday morning.)

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.

Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:30 p.m. to 5 a.m. (Sunday night through Friday morning.)

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.

Leave a Reply

Your email address will not be published. Required fields are marked *